Auger Drill Stuck in Silkyara Rubble, No Quick Exit in Sight Now for Trapped Workers

TrendRiot
On day 14 of the multi-agency rescue mission, officials shifted focus to two alternatives — manual drilling through the remaining 10- or 12-metre stretch of the rubble or, more likely, drilling down 86 metres from above

from Top India News- News18.com https://ift.tt/SL579lx
On day 14 of the multi-agency rescue mission, officials shifted focus to two alternatives — manual drilling through the remaining 10- or 12-metre stretch of the rubble or, more likely, drilling down 86 metres from above
Tags

Post a Comment

0Comments
Post a Comment (0)